353 Ceiling Track Hoists With Curtain Hoppers Installed At Midland Met Hospital
We supported Midland Metropolitan University Hospital with the design and installation of 353 ceiling track hoists for a combination of single rooms and 4/6 bed bays
For NHP design teams, contractors and trusts
We have installed the hoisting at Midland Met and the National Rehabilitation Centre. We bring the same coordinated approach to your scheme, from design stage to handover and servicing.
Tell us a little about your scheme and a hoisting specialist will arrange a Microsoft Teams call.
The design challenge
Structure, track coverage and servicing cost far less to get right at design than on site. Every NHP bedroom is a single room, so hoisting is planned room by room, alongside the services in the ceiling.
The track mounting has to be designed into the ceiling with everything else, alongside ventilation, medical gases, electrical containment and fire and acoustic barriers.
Each room’s track is separate from corridors and other rooms, so every room is planned and fixed individually.
Hoists need regular inspection and servicing throughout their life. Planning access and a servicing approach at design stage avoids problems later.
A detachable hoist option means schemes can plan their hoist numbers differently.
What we deliver
Every part is designed to work with the building, and with the other equipment your scheme needs.
Track inset into the ceiling, with the hoist stored away when not in use.
See our ceiling hoist systemsHidden within bed head units and cabinetry.
Track in each room, with a detachable hoist option for schemes exploring it.
For the full range of patient mobility needs.
We commission the system and show staff how to use it safely.
Bathing, hygiene and beds from the same team where your scheme needs them.
One team. One programme. One point of accountability.
Cost planning
Hoisting needs a clear line in the cost plan and a clear owner for the allowance. Agreeing both at design stage avoids surprises later.
We survey the site and learn how the space needs to work for the people using it and the staff supporting them.
We design the complete solution and coordinate with your architect, contractors and project team.
We install, commission and hand over, with training for your staff.
Planned servicing and support keep everything safe, compliant and working for years to come.
Proven on NHP schemes
We supported Midland Metropolitan University Hospital with the design and installation of 353 ceiling track hoists for a combination of single rooms and 4/6 bed bays
Supplying and installing the complete hoisting provision for a £107 million, 70-bed specialist rehabilitation centre at the Stanford Hall Rehabilitation Estate.
Speak to us while the ceiling design is still open. Early coordination protects the ceiling layout, programme and cost.
Planning ahead
Hoisting works best when it is designed in with the rest of the ceiling, not added around it.
Specifier’s Guide to Overhead Hoist Systems
Download the guideNHP hoisting guides
Practical articles on designing, costing and servicing ceiling hoisting on New Hospital Programme schemes.
In the single supplier vs multiple specialist suppliers decision, the equipment price is rarely where the difference lies. On New…
Read the guideOn a New Hospital Programme (NHP) build, ceiling track hoisting should be considered as part of the hospital-wide design rather…
Read the guideThe opening of Midland Metropolitan University Hospital marks a major milestone for healthcare infrastructure in the UK. As one of…
Read the guideHealthcare environments are among the most complex buildings to design and deliver. Unlike standard commercial projects, they must meet strict…
Read the guideYes. We installed 353 ceiling track hoists at Midland Met and the complete hoisting provision at the National Rehabilitation Centre.
As early as the ceiling design, so the track mounting is designed in alongside the other ceiling services.
Yes. Each room has its own independent track, and a detachable hoist option is available.
Yes. We design, install and service, so the same team stays responsible.
Yes. We work with the principal contractor and project team from design stage, as we did at Midland Met and the National Rehabilitation Centre.
Book a Microsoft Teams call and a hoisting specialist will arrange it.
Share a few details and a hoisting specialist will arrange a Microsoft Teams call to talk through your scheme and what is possible.
Prefer to talk now? Call 0345 034 1450, 9am to 5pm, Monday to Friday.