Bespoke Hydrotherapy Pool Installation For Rehabilitation Centre

A bespoke stainless steel hydrotherapy pool and a full specialist equipment fit-out for a new 23-bed residential rehabilitation centre.

Bespoke Hydrotherapy Pool Installation For Rehabilitation Centre
Client STEPS Rehabilitation
Location Sheffield
Architect Alston Murphy Architects
Contractor Northern Construction Solutions
Sector

The Challenge

STEPS Rehabilitation was developing a new 23-bed residential centre in Sheffield to support clients with neurological, spinal and orthopaedic injuries and illnesses. The vision was clear: a facility anyone would feel comfortable sending a loved one to, equipped with products people would be happy to have in their own homes. That meant bringing together a wide range of specialist equipment, from hydrotherapy and hoisting to beds, bathroom fittings and furniture, without the centre feeling clinical. The challenge was delivering all of this to a high standard while keeping the project straightforward for the client and wider build team.

Approach

STEPS first contacted Innova during their research phase and chose to work with us because of our specialist knowledge and the breadth of our product range. Rather than sourcing equipment from several suppliers, the team could plan the centre’s specialist requirements with a single partner. Innova worked closely with STEPS, Alston Murphy Architects and Northern Construction Solutions from the outset. This made sure every element was considered together and coordinated with the wider build. Products were selected for their subtle, sophisticated design, supporting the warm and comfortable atmosphere STEPS wanted to create.

Implementation

At the heart of the project, Innova designed and installed a fully bespoke stainless steel hydrotherapy pool, built around the needs of STEPS’ clients and finished with massage jets and colour-changing lights. Alongside the pool, we equipped the centre with multiple X-Y ceiling hoisting systems, profiling care beds, foam mattresses, wash basins, grab rails, overbed tables, slings and a range of loose furniture. Delivering the hydrotherapy, moving and handling and furnishing elements as one coordinated package meant fewer interfaces to manage. It also gave the centre a consistent look and feel throughout.

Results

STEPS now has a high-quality rehabilitation environment that feels comfortable and welcoming while supporting complex clinical needs. Nearly ten years on, the stainless steel pool remains central to the centre’s therapy programme. It is in use all day, six days a week, and still looks as good as when it was installed. STEPS chose stainless steel over a traditional tiled pool because they believed it would be more hygienic, easier to maintain and longer-lasting, and that has proved to be the case.

The relationship has continued well beyond installation. STEPS has been able to borrow equipment from Innova while waiting for new orders to arrive, keeping care uninterrupted.

“The service is superb. We can ring up and borrow equipment whilst we’re waiting for ordered equipment to arrive. We’ve been very impressed and they’re a pleasure to work with. [We would] absolutely recommend working with Innova – [they are] very easy to deal with and always very helpful and accommodating.”

 

 

“I am very happy to recommend the stainless steel pool and would most definitely go for this option again. We felt a stainless pool would be more hygienic, easier to maintain and look good for longer, which has been our experience. We use it six days a week, all day, and it still looks lovely almost 10 years on.”

Jules Shiel-Boulger, Founder & Business Development Director – STEPS Rehabilitation  

Speak to The Experts

Need assistance with product enquiries, general inquiries, or product support? Our Phonelines are open 9am - 5pm Monday to Friday

0345 034 1450

Or, fill out the form for a call back.

Contact Us