A modular hygiene room is a purpose-designed building containing the specialist equipment and facilities required for changing, toileting, showering and assisted transfers.
The room is manufactured primarily off site before being delivered and installed at the school. This can reduce the amount of construction activity and disruption required compared with creating or extending a room through traditional on-site construction.
The room can be configured to include a ceiling track hoist system, height-adjustable changing bench, accessible WC, specialist wash-dry toilet, assisted showering facilities, shower trolley, washbasin, storage and privacy provision.
The exact equipment specification should be based on pupil needs, staff working practices and the school’s operational requirements.
The space required will depend on the number and needs of pupils, the equipment being installed, the type of assisted transfers undertaken and the number of staff providing support.
Innova can help assess these requirements and develop an appropriate room layout during the early design and feasibility stages.
Yes. The room layout and equipment can be developed around pupil mobility, transfer methods, personal care routines, supporting staff and anticipated future needs.
Where the room will serve several pupils, the design should balance individual requirements with flexibility for the wider school population.
Planning permission may be required because the modular hygiene room is normally treated as an additional building or extension.
Requirements will depend on the proposed location, size, appearance and local planning authority. Planning responsibilities should be confirmed during the project’s feasibility stage.
The division of responsibility will depend on the agreed project scope.
Groundworks, foundations, drainage, electrical supplies, water connections and access arrangements should be identified and coordinated before manufacture and installation begin. Innova will work with the school, contractor and design team to establish clear responsibilities.
Yes. A range of external finishes can be considered to help the modular hygiene room complement the existing school buildings and meet planning or design requirements.
Options will depend on the modular construction system, project budget and required programme.
Where project timings, manufacturing, planning and site preparation allow, delivery and installation can be scheduled during school holiday periods to help reduce disruption.
Early engagement is important because groundworks, utility connections and access arrangements may need to be completed before the modular room arrives.
Yes. Innova can provide equipment commissioning, user training and ongoing servicing for the specialist care equipment installed within the hygiene room.
This helps the school maintain safe operation and provides continued support after the initial project has been completed.